Carrier Air Traffic Control Center Practice Test

Disable ads (and more) with a premium pass for a one time $4.99 payment

Question: 1 / 195

How many minutes before scheduled flight operations shall CATCC be manned and ready?

60 minutes

90 minutes

Carrier Air Traffic Control Center (CATCC) personnel must be manned and ready 90 minutes before scheduled flight operations to ensure the safe and efficient management of air traffic during carrier operations. This advance preparation time is crucial for several reasons:

1. **Pre-Flight Coordination**: The 90-minute window allows air traffic controllers to coordinate with flight operations and prepare for the day’s flight schedule. This includes reviewing weather conditions, potential hazards, and ensuring that all procedures are in place.

2. **System Checks and Calibration**: Technological systems utilized for tracking and communicating with aircraft need time for checks and calibration. This timeframe ensures that all equipment, including radar and communication tools, are functioning optimally before operations begin.

3. **Briefing Staff**: The necessity for comprehensive briefings to the personnel is critical. This time allows for discussions about any changes or updates in procedures, as well as assigning roles and responsibilities.

4. **Safety Protocols**: Safety cannot be compromised in air traffic management. Being ready 90 minutes in advance ensures that all safety protocols are in place and that the team is prepared for any contingencies that may arise throughout the day.

This structured approach is key to maintaining operational safety and efficiency in one of the most

Get further explanation with Examzify DeepDiveBeta

120 minutes

30 minutes

Next

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy